Electronics ODM · Dongguan, China

From product idea to mass production, with one partner

Tell us what your product should do. We design the electronics, build and test prototypes, then produce it in our own factory. You deal with one team from the first sketch to the first container.

  • Since 2009Manufacturing in Dongguan
  • 3 SMT linesIn-house Siemens high-speed
  • 10,000 / dayBoard capacity
  • From 1 boardNo minimum order
  • 14–21 daysTypical sample lead time
  • ISO 9001:2015Certified

How it works

Short answer: you bring the product idea and the market, we bring the engineering and the factory. Each stage ends with something you can check before we move to the next one.

Define the product

We agree on what the product must do, the target cost and the volumes. You get a clear spec to approve.

Design the electronics

Our engineers draw the circuit and lay out the PCB, choosing parts you can actually buy in volume.

Build and test prototypes

We build working samples, usually in 14–21 days from complete files, so you can test them in your hands.

Pilot run

A small batch on the real production line shows the design is easy to build and test before you order volume.

Mass production

Production runs on our 3 Siemens SMT lines, with up to 10 million placements a month.

Who we work with

We are a good fit if you want a finished electronic product but don't want to build your own hardware team or manage several suppliers.

  • Brands adding an electronic productYou know your customers and your market. We handle the circuit, the parts and the factory.
  • Startups with a prototypeYour prototype works on the bench. We turn it into a design that can be built reliably at volume.
  • Companies moving productionYou have a product in production elsewhere and want one partner for design changes and manufacturing.
Recent project

Pour-over coffee kettle

A pour-over coffee kettle brand worked with us on both product development and production.

  • Product development with our engineering team
  • Production in our Dongguan factory

Questions we get asked

If yours isn't here, email us. An engineer replies within 1 business day.

Is there a minimum order quantity?

No. You can order from 1 board, so you can test a design before you commit to volume.

How long do samples take?

Samples and small batches typically take 14-21 days once we have complete files.

How fast will I get a reply?

An engineer replies within 1 business day after we confirm we have received your request.

Where is production done?

In our own factory in Dongguan, China, on 3 in-house Siemens high-speed SMT lines. We are ISO 9001:2015 certified.

I only have an idea, not a design. Can you still help?

Yes. Send us what the product should do, a sketch or a similar product. We work out the electronics with you, then build and test prototypes before production.

Tell us about your product

Email or message us. An engineer replies within 1 business day after we confirm we have your request.

To get a useful first answer, tell us: what the product does, how it is powered, the target retail price, your expected yearly volume, and any photos or sketches.